Bridgeport Mill – Installing the Table
With the saddle on, I can go ahead and get the table buttoned up.
Bridgeport Mill – Installing the Saddle and Oil Lines
With the knee and oil pump in place, I can install the saddle and the rest of the oil lines.
Bridgeport Mill – Bijur One-Shot Lube System
In this video I start to reassemble the Bijur One-Shot Lub system. I made my own gasket, which necessitated I make my own gasket punch as well.
Bridgeport Mill – Installing the Knee
I’ve cleaned up the base, knee, saddle and table. I’m going to start this phase of reassembly by putting the Z axis and knee back on the base.
Merry Christmas to you and yours!
Wishing you and your family a very Merry Christmas!
Bridgeport Mill Disassembly – Table, Saddle and Knee
In this video, I start the tear-down of my Bridgeport Mill by removing the table, saddle and knee, plus other miscellaneous accoutrements.
Channel Stickers!
Sharing some channel stickers I received recently. If you’d like to trade, drop me an email: greg@mylilmule.us
Bridgeport Vertical Mill Rebuild – Plan of Attack
Starting on my next major project. In this video, I discuss the things that need to be corrected on my Series I Bridgeport Vertical Mill and other tooling.
Kennedy Tool Box Refresh
I found this set of Kennedy Toolboxes on the local Craigs List but they needed some cleanup.